[Mar-2023] Exam Sure Pass SAP Certification with E_S4HCON2022 exam questions
Real SAP E_S4HCON2022 Exam Questions Study Guide
SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Manual Activities for SUM | Describe the necessary manual preparation and follow-on activities for SUM ADM328 | 8% - 12% |
| SUM Execution Part | Perform the SUM execution part, including DMO ADM328 | > 12% |
| Handling of an SAP System Landscape | Describe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade ADM328 | 8% - 12% |
| Downtime | Describe the factors influencing downtime and techniques to reduce downtime ADM328 | 8% - 12% |
| Modification Adjustment | Perform the modification adjustment with SPDD and SPAU ADM328 | 8% - 12% |
| SAP S/4HANA Conversion Prepare Phase | Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase ADM328 | > 12% |
| SUM Monitoring and Troubleshooting | Monitor and troubleshoot the SUM procedure ADM328 | 8% - 12% |
NEW QUESTION 39
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport between Unicode and non-Unicode systems is forbidden.
- B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- C. The upgrade of the PRD must be finished before you start new development in the DEV.
- D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
Answer: D
NEW QUESTION 40
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. During conversion, SUM delivers some business functions already activated.
- B. Specify the business functions that need to be switched on during the prepare part of SUM.
- C. Activate the required business functions manually in the production system.
- D. Import a transport request from the development system that contains the recording of the activation.
Answer: A,D
NEW QUESTION 41
ICNV initialization does 3
- A. Creation of views
- B. AA
- C. Build index on flag column
- D. Creation of flag
Answer: A,C,D
NEW QUESTION 42
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. SAP S/4HANA conversion including database migration and Unicode conversion
- B. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
- D. Unicode conversion SAP S/4HANA conversion including database migration
- E. Unicode conversion Database migration SAP S/4HANA conversion without database migration
Answer: C,D,E
NEW QUESTION 43
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- C. You need to build up a SI check framework by applying SAP notes.
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems.
Answer: A,C
NEW QUESTION 44
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Silent data migration (SDM)
- B. Shadow on target creation
- C. Downtime conversion
- D. Downtime migration
Answer: D
NEW QUESTION 45
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Standalone AS ABAP with SAP_BASIS 752 and above
- B. SAP Solution Manager 7.2
- C. SAP ECC system from SAP ERP 6.0 EHP 8
- D. SAP S/4HANA Server 1809 and above
Answer: A,D
NEW QUESTION 46
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Manually activate the adjusted dictionary objects
- B. Create "modified* versions of the objects that you need to adjust
- C. Release the transport request containing the modification adjustment
- D. Assign the transport request as a modification adjustment transport
Answer: B,D
NEW QUESTION 47
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Import of upgrade and language data from the download directory in phase TABIM UPG
- C. Activation of dictionary objects in phase ACT_UPG
- D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
Answer: A,B,C
NEW QUESTION 48
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION 49
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Upgrading to SAP ECC 6.08 without using DMO
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Updating to SAP ECC 6.07 using DMO
- D. Using DMO when applying Support Packages to SAP ECC 6.07
Answer: A,B
NEW QUESTION 50
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An SAP S/4HANA conversion is performed, without adapting the customer data.
- B. A change of the database type is performed, without changing the software components.
- C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- D. An upgrade of the software components is performed, without changing the database type.
Answer: B
NEW QUESTION 51
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the business downtime
- B. The start of the business downtime
- C. The end of the database migration
- D. The start of the Execution roadmap step
Answer: A
NEW QUESTION 52
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for running batch jobs in the shadow system via Job Overview (SM37)
- B. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- C. Check for running R3trans processes on the host of the primary application server
- D. Check for running R31oad processes on the host of the primary application server
Answer: B,C
NEW QUESTION 53
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Before the downtime starts
- B. Early in the downtime
- C. As part of the cleanup process
- D. At the end of the downtime
Answer: A
NEW QUESTION 54
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. Target DB size will increase temporarily
- B. A
- C. DMO can only be run with systems NW740 or NW731
Answer: A,C
NEW QUESTION 55
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Phaselist
- C. In DMO Migration Preparation
- D. In SUM Parameters
Answer: A,D
NEW QUESTION 56
......
Updated and Accurate E_S4HCON2022 Questions for passing the exam Quickly: https://testking.vcetorrent.com/E_S4HCON2022-valid-vce-torrent.html